Skip to content

Prepare the winery downtime

Vincent Sellier requested to merge cea-blackout into production

The downtime was scheduled since 08:00 CEST so step 1 and step 2 can be applied at the same time.

step 3 and step 4 can be applied together before starting to stop the winery infra

Merge request reports